loader

Report on Power Sector Apr’26: Transmission – Removing the Resistors To Improve Flow of Capital

The Report discusses why FY27 could be a turning point for the power transmission sector, after half a decade of moderate growth. It posits near term regulatory and structural changes as essential for long-term health of the industry. Providing estimates for the capex required for fulfilling the needs of the power sector in the next six years, it calls on stakeholders to explore alternate means of capital raising. While discussing monetisation as a means of capital recycling, it highlights InvITs as an apt mode for the same. A brief elucidation of how challenges faced by InvITs are being solved creatively follows. The Report concludes by scratching the surface of the next frontier of monetisation – state TRANSCO owned InSTS assets. Some measures to accelerate this process are suggested, as well as the sheer quantum such a move could release for States.

Subscribe

    Subscribe to content and reports from SBICAPS


    Fields marked with an asterisk (*) are required.






    Accessibility Controls

    Color Contrast

    High contrast background & text

    Screen Reader

    Hover-to-speech English voice assistant

    Keyboard Nav

    Enhanced tab focus outline & skip link

    Video

    Pauses sliders, animations & media players

    Other Helpers

    Enlarges cursor & highlights active links

    Zoom Scaling

    Adjust core sizing level (-4px to +8px)

    Default